{"amendmentNumber":"C159egip","schemes":[{"name":"East Gippsland","code":"egip"}],"description":"Inserts a new Schedule 1 to the Erosion Management Overlay, includes an Incorporated Document to assist geotechnical engineering practitioners with preparing permit applications, and makes other consequential changes to the operational provisions.","status":"Gazetted","statusDate":"2026-04-23T14:37:32Z","planningAuthorityContact":{"authority":"East Gippsland Shire Council","fullAddress":"273 Main Street Bairnsdale VIC 3875 Australia","phone":"(03) 5153 9500"},"unpublished":false,"outcome":"ApprovedWithChanges","stages":{"exhibitionRequired":true,"exhibition":{"startDate":"2025-10-15T13:00:00Z","endDate":"2025-11-27T13:00:00Z","submissionsEndDate":"2025-11-27T13:00:00Z","explanatoryReport":{"filename":"East Gippsland C159egip Explanatory Report Exhibition Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%20Explanatory%20Report%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_d413bc37-2d72-4bb9-9a2e-995f459ef8d6.docx","bytes":53820},"instructionSheet":{"filename":"East Gippsland C159egip Instruction Sheet Exhibition Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%20Instruction%20Sheet%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_ba6467e8-7d81-4310-a17a-5b195b831b76.docx","bytes":38966},"clausesAndSchedules":[{"filename":"44.01_egip Schedule 1 Erosion Management Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/44.01_egip%20Schedule%201%20Erosion%20Management%20Overlay_26104bd4-ddec-ea11-a815-000d3acb8f76_3c9e2f55-d82f-46e1-b9ee-10bc8f34ada1.pdf","bytes":225754},{"filename":"72.04_egip Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_egip%20Schedule%20Incorporated%20Documents_26104bd4-ddec-ea11-a815-000d3acb8f76_42984889-b5b3-45c8-8fc2-526d2e67df15.pdf","bytes":156411},{"filename":"72.08_egip Schedule Background Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.08_egip%20Schedule%20Background%20Documents_26104bd4-ddec-ea11-a815-000d3acb8f76_5cee428c-5100-4e13-811c-9ca2509a4ca2.pdf","bytes":163486},{"filename":"74.02_egip Schedule Further Strategic Work.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/74.02_egip%20Schedule%20Further%20Strategic%20Work_26104bd4-ddec-ea11-a815-000d3acb8f76_c48b817b-03ae-40d8-ab04-0c0977bc7e27.pdf","bytes":99900}],"mapSheets":[],"supportingDocuments":[{"filename":"East Gippsland C159egip 44.01_egip Schedule 1 Erosion Management Overlay track changes Exhibition Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%2044.01_egip%20Schedule%201%20Erosion%20Management%20Overlay%20track%20changes%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_48125560-e4a6-4cbd-a10d-e9e7ef2333d9.pdf","bytes":158551},{"filename":"East Gippsland C159egip 72.04_egip Schedule Incorporated Documents track changes Exhibition Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%2072.04_egip%20Schedule%20Incorporated%20Documents%20track%20changes%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_270645f4-4d78-4594-a084-ee961865f6e9.pdf","bytes":157194},{"filename":"East Gippsland C159egip 72.08_egip Schedule Background Documents track changes Exhibition Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%2072.08_egip%20Schedule%20Background%20Documents%20track%20changes%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_3693bd77-32e9-4427-9da2-903f66b19eae.pdf","bytes":169545},{"filename":"East Gippsland C159egip 74.02_egip Schedule Further Strategic Work track changes Exhibition Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%2074.02_egip%20Schedule%20Further%20Strategic%20Work%20track%20changes%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_65b50b4a-18f4-4ccd-bc22-eee3450d9305.pdf","bytes":100622}],"incorporatedDocuments":[{"filename":"Requirements for a Geotechnical Assessment, Landslide Risk Assessment or Landslide Hazard Assessment prepared in support of a planning permit application under the Erosion Management Overlay (WSP, 2025).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/Requirements%20for%20a%20Geotechnical%20Assessment,%20Landslide%20Risk%20Assessment%20or%20Landslide%20Hazard%20Assessment%20prepared%20in%20support%20of%20a%20planning%20permit%20application%20under%20the%20Erosion%20Management%20Overlay%20(WSP,%202025)_26104bd4-ddec-ea11-a815-000d3acb8f76_e5201f71-63c0-4e16-80a0-c0cab3d9194e.pdf","bytes":164534}],"otherDocuments":[{"filename":"East Gippsland C159egip Basis for Amendment to Erosion Management Overlay (WSP, 2025) Exhibition Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/East%20Gippsland%20C159egip%20Basis%20for%20Amendment%20to%20Erosion%20Management%20Overlay%20(WSP,%202025)%20Exhibition%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_122e6e79-4c11-49d2-be9d-58deb5b71c50.pdf","bytes":1257710,"classification":"Background Documents"}]},"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2026-02-17T00:00:00Z"},"submittedDate":"2026-03-03T00:49:05Z","gazettal":{"date":"2026-04-23T14:00:00Z","operationalDate":"2026-04-23T14:00:00Z","explanatoryReport":{"filename":"C159egip Explanatory Report Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%20Explanatory%20Report%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_bf1b12f6-405e-4317-9e16-eef784eafe76.docx","bytes":54618},"instructionSheet":{"filename":"C159egip Instruction Sheet Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%20Instruction%20Sheet%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_5f42d1e8-57b0-47db-9e45-006aa71e2567.docx","bytes":36667},"clausesAndSchedules":[{"filename":"44.01_egip Schedule 1 Erosion Management Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/44.01_egip%20Schedule%201%20Erosion%20Management%20Overlay_26104bd4-ddec-ea11-a815-000d3acb8f76_0e8c46f5-4320-4335-99b1-dc38b340d930.pdf","bytes":225475},{"filename":"72.04_egip Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_egip%20Schedule%20Incorporated%20Documents_26104bd4-ddec-ea11-a815-000d3acb8f76_cf7010de-3192-42e9-a979-4fc86105ede2.pdf","bytes":156778},{"filename":"72.08_egip Schedule Background Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.08_egip%20Schedule%20Background%20Documents_26104bd4-ddec-ea11-a815-000d3acb8f76_58cb9b77-6299-41ad-8ab3-039b98b68e27.pdf","bytes":165361},{"filename":"74.02_egip Schedule Further Strategic Work.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/74.02_egip%20Schedule%20Further%20Strategic%20Work_26104bd4-ddec-ea11-a815-000d3acb8f76_dc8ac939-eb97-4cba-ab4e-cedfa227f3ee.pdf","bytes":100654}],"mapSheets":[],"supportingDocuments":[{"filename":"C159egip 44.01_egip Schedule Erosion Management Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%2044.01_egip%20Schedule%20Erosion%20Management%20Overlay%20track%20changes%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_e61d7787-35a5-4a32-bd03-f4d94cad80a7.pdf","bytes":158551},{"filename":"C159egip 72.04_egip Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%2072.04_egip%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_27f7f5e9-e2ef-46f5-a1d5-4e742cda12be.pdf","bytes":157644},{"filename":"C159egip 72.08_egip Schedule Background Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%2072.08_egip%20Schedule%20Background%20Documents%20track%20changes%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_6f0b7f69-0a3d-4477-b0e7-463aa6aac8f6.pdf","bytes":168147},{"filename":"C159egip 74.02_egip Schedule Further Strategic Work track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%2074.02_egip%20Schedule%20Further%20Strategic%20Work%20track%20changes%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_50cf9e7f-5193-4f94-bfc2-12ee1590bec9.pdf","bytes":101646}],"incorporatedDocuments":[{"filename":"Requirements for a Geotechnical Assessment, Landslide Risk Assessment or Landslide Hazard Assessment in support of a planning permit under the EMO (WSP, January 2025).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/Requirements%20for%20a%20Geotechnical%20Assessment,%20Landslide%20Risk%20Assessment%20or%20Landslide%20Hazard%20Assessment%20in%20support%20of%20a%20planning%20permit%20under%20the%20EMO%20(WSP,%20January%202025)_26104bd4-ddec-ea11-a815-000d3acb8f76_9b77b27f-94e0-4362-a64d-0aa26a0a86f9.pdf","bytes":295139}],"otherDocuments":[{"filename":"C159egip Basis for Amendment to Erosion Management Overlay (WSP, 2025) Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C159egip%20Basis%20for%20Amendment%20to%20Erosion%20Management%20Overlay%20(WSP,%202025)%20Approval%20Gazetted_26104bd4-ddec-ea11-a815-000d3acb8f76_9a0c175b-21f2-4c2a-a8fb-f991cf3bc554.pdf","bytes":1257710,"classification":"Background Documents"}]},"decisionRequired":true},"classification":"Exhibited","dfp":false}