{"amendmentNumber":"C164basc","schemes":[{"name":"Bass Coast","code":"basc"}],"description":"The amendment facilitates the Isle of Wight development, a regionally significant tourism and accommodation destination at 9-11 The Esplanade and 2-8 Bass Avenue, Cowes by applying a Specific Controls Overlay to the land.","status":"Finished","statusDate":"2024-07-02T03:16:51Z","planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"Level 16, 8 Nicholson Street East Melbourne VIC 3002 Australia","phone":"(03) 8683 0964"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2024-03-05T13:00:00Z"},"submittedDate":"2024-01-16T00:05:49Z","gazettal":{"date":"2024-03-13T13:00:00Z","operationalDate":"2024-03-13T13:00:00Z","explanatoryReport":{"filename":"Bass Coast C164basc Explanatory Report Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_76ed0c1d-1867-49eb-b441-19ffaebc273c_Bass%20Coast%20C164basc%20Explanatory%20Report%20Approval%20Gazetted.docx","bytes":1909561},"instructionSheet":{"filename":"Bass Coast C164basc Instruction Sheet Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_2b73b0b5-9e65-49a1-9c15-068e9f325f28_Bass%20Coast%20C164basc%20Instruction%20Sheet%20Approval%20Gazetted.docx","bytes":40535},"clausesAndSchedules":[{"filename":"45.12_basc Schedule Specific Controls Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_396b8575-4c76-4d9d-930c-b4b1b4cc5574_45.12_basc%20Schedule%20Specific%20Controls%20Overlay.pdf","bytes":143350},{"filename":"72.03_basc Schedule What does this Planning Scheme consist of.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_a9b6721a-b9c2-4418-b32e-7e9433994ef9_72.03_basc%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of.pdf","bytes":90489},{"filename":"72.04_basc Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_0c7b3740-b973-4290-a118-42c5c96689ec_72.04_basc%20Schedule%20Incorporated%20Documents.pdf","bytes":157013}],"mapSheets":[{"filename":"Bass Coast C164basc 001scoMap26 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_a194b6a0-8358-4895-80c5-d17f7dd1b545_Bass%20Coast%20C164basc%20001scoMap26%20Approval%20Gazetted.pdf","bytes":196650}],"supportingDocuments":[{"filename":"Bass Coast C164basc 45.12_basc Schedule Specific Controls Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_4fb92e2b-5f84-43ed-ad17-16f8fdc7be93_Bass%20Coast%20C164basc%2045.12_basc%20Schedule%20Specific%20Controls%20Overlay%20track%20changes%20Approval%20Gazetted.pdf","bytes":144290},{"filename":"Bass Coast C164basc 72.03_basc Schedule What does this Planning Scheme consist of track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_57c46dcc-6715-4a45-a2fd-0c24f61d197f_Bass%20Coast%20C164basc%2072.03_basc%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of%20track%20changes%20Approval%20Gazetted.pdf","bytes":91137},{"filename":"Bass Coast C164basc 72.04_basc Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_be07fd03-1455-4806-8f2b-7d499f79aa19_Bass%20Coast%20C164basc%2072.04_basc%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted.pdf","bytes":157825},{"filename":"Bass Coast C164basc Reasons for Intervention Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_4531f878-b323-496c-9ed3-f8548739c4be_Bass%20Coast%20C164basc%20Reasons%20for%20Intervention%20Approval%20Gazetted.docx","bytes":38091}],"incorporatedDocuments":[{"filename":"Isle of Wight Incorporated Document (Department of Transport and Planning, February 2024).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/9a5393c3-349d-ee11-be37-002248933fc5_b7dbac32-cd8c-412c-a78c-5a89a0ed81e9_Isle%20of%20Wight%20Incorporated%20Document%20(Department%20of%20Transport%20and%20Planning,%20February%202024).pdf","bytes":789980}],"otherDocuments":[]},"decisionRequired":true},"classification":"Ministerial","dfp":true}