{"amendmentNumber":"C202knox","schemes":[{"name":"Knox","code":"knox"}],"description":"Facilitates the use and development of land associated with the Basin Solar Farm, which comprises of a solar energy facility, associated building and works, and vegetation removal, by applying the Specific Controls Overlay and inserting a new Incorporated Document titled The Basin Solar Farm, 49 Basin-Olinda Road, The Basin (Perry Town Planning, March 2025).","status":"Finished","statusDate":"2025-08-13T00:01:58Z","planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"Level 16, 8 Nicholson Street East Melbourne VIC 3002 Australia","phone":"(03) 8683 0964"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2025-04-02T00:00:00Z"},"gazettal":{"date":"2025-04-23T14:00:00Z","operationalDate":"2025-04-23T14:00:00Z","explanatoryReport":{"filename":"C202knox Explanatory Report Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%20Explanatory%20Report%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_863a53e7-cb66-4a57-b846-8dd1e9340714.docx","bytes":315025},"instructionSheet":{"filename":"C202knox Instruction Sheet Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%20Instruction%20Sheet%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_0c6c5303-742d-47dc-ba0a-e4b14a4ff6fe.docx","bytes":39321},"clausesAndSchedules":[{"filename":"45.12_knox Schedule Specific Controls Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/45.12_knox%20Schedule%20Specific%20Controls%20Overlay_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_769dd734-6ff3-42c2-96aa-7690390bc31e.pdf","bytes":121361},{"filename":"72.03_knox Schedule What does this Planning Scheme consist of.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.03_knox%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_65f70850-3641-4d8e-80f1-e47c091eeb42.pdf","bytes":88856},{"filename":"72.04_knox Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_knox%20Schedule%20Incorporated%20Documents_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_f4fdae41-41d1-4b5a-8518-073809bb1b0d.pdf","bytes":151049}],"mapSheets":[{"filename":"C202knox 001scoMap03 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%20001scoMap03%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_d61859b2-b0a1-4515-9d5b-128999fdc5ef.pdf","bytes":294359}],"supportingDocuments":[{"filename":"C202knox 45.12_knox Schedule Specific Controls Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%2045.12_knox%20Schedule%20Specific%20Controls%20Overlay%20track%20changes%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_eb0aa879-299a-4029-b8e2-c5945c5295bc.pdf","bytes":122053},{"filename":"C202knox 72.03_knox Schedule What does this Planning Scheme consist of track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%2072.03_knox%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of%20track%20changes%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_054b8464-3385-4330-b2f0-db0e2f1b8ce8.pdf","bytes":89394},{"filename":"C202knox 72.04_knox Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%2072.04_knox%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_9f9a6e0d-d43c-4544-83b7-00f742e9a473.pdf","bytes":152065}],"incorporatedDocuments":[{"filename":"The Basin Solar Farm, 49 Basin-Olinda Road, The Basin (Perry Town Planning, March 2025).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/The%20Basin%20Solar%20Farm,%2049%20Basin-Olinda%20Road,%20The%20Basin%20(Perry%20Town%20Planning,%20March%202025)_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_4067f5ef-864a-4f35-b7a0-aae45eeefac4.pdf","bytes":1121302}],"otherDocuments":[{"filename":"C202knox Reasons for Intervention Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C202knox%20Reasons%20for%20Intervention%20Approval%20Gazetted_1433c0fe-4e54-ef11-bfe2-6045bdc3ce95_7ce7344c-15f5-4f1b-81f4-c2b4a245f772.docx","bytes":39512,"classification":"Reasons for Intervention"}]},"decisionRequired":false},"classification":"Ministerial","dfp":false}