{"amendmentNumber":"C466ggee","schemes":[{"name":"Greater Geelong","code":"ggee"}],"description":"Facilitates the use and development of land associated with the Little River Battery Energy Storage System (BESS), which comprises of a 770MWh BESS, subdivision of land and native vegetation removal, by applying the Specific Controls Overlay and inserting a new Incorporated Document titled Little River Battery Energy Storage System (BESS) (Department of Transport and Planning, March 2025).","status":"Finished","statusDate":"2025-08-27T00:02:13Z","planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"1 Spring Street Melbourne VIC 3000 Australia","phone":"1800 789 386"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2025-05-03T14:00:00Z"},"gazettal":{"date":"2025-05-21T14:00:00Z","operationalDate":"2025-05-21T14:00:00Z","explanatoryReport":{"filename":"C466ggee Explanatory Report Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%20Explanatory%20Report%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_99a52644-09e6-4843-878c-d372cd854c94.docx","bytes":1012714},"instructionSheet":{"filename":"C466ggee Instruction Sheet Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%20Instruction%20Sheet%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_54c3ccf2-f15b-4424-81a2-8a24005ba2e4.docx","bytes":39240},"clausesAndSchedules":[{"filename":"45.12_ggee Schedule Specific Controls Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/45.12_ggee%20Schedule%20Specific%20Controls%20Overlay_9cb05a7d-f763-ee11-8df0-002248933fc5_69731bd9-59ae-4e66-91dc-a9c693b905a4.pdf","bytes":126250},{"filename":"72.03_ggee Schedule What does this Planning Scheme consist of.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.03_ggee%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of_9cb05a7d-f763-ee11-8df0-002248933fc5_606d447f-d128-4fa2-9c13-c40b2a2c4c62.pdf","bytes":94326},{"filename":"72.04_ggee Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_ggee%20Schedule%20Incorporated%20Documents_9cb05a7d-f763-ee11-8df0-002248933fc5_59306203-da62-4ff0-b03b-d449074a8079.pdf","bytes":196889}],"mapSheets":[{"filename":"C466ggee 001scoMap07 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%20001scoMap07%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_7124d723-8f50-47d3-8073-3c64d0ab67d2.pdf","bytes":179663}],"supportingDocuments":[{"filename":"C466ggee 45.12_ggee Schedule Specific Controls Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%2045.12_ggee%20Schedule%20Specific%20Controls%20Overlay%20track%20changes%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_c99aef21-df59-4089-a49d-7476c7a982a5.pdf","bytes":126672},{"filename":"C466ggee 72.03_ggee Schedule What does this Planning Scheme consist of track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%2072.03_ggee%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of%20track%20changes%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_3f5716b8-69f5-46a2-b696-f1da50cf885e.pdf","bytes":94673},{"filename":"C466ggee 72.04_ggee Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%2072.04_ggee%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_f0fcb1f9-83ab-42e9-82b9-424df68cb9bc.pdf","bytes":197425}],"incorporatedDocuments":[{"filename":"Little River Battery Energy Storage System (BESS) (Department of Transport and Planning, March 2025).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/Little%20River%20Battery%20Energy%20Storage%20System%20(BESS)%20(Department%20of%20Transport%20and%20Planning,%20March%202025)_9cb05a7d-f763-ee11-8df0-002248933fc5_95319af8-112d-420a-9a14-f25d5d852433.pdf","bytes":357624}],"otherDocuments":[{"filename":"C466ggee Reasons for Intervention Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/C466ggee%20Reasons%20for%20Intervention%20Approval%20Gazetted_9cb05a7d-f763-ee11-8df0-002248933fc5_35e8c00b-20eb-45ba-95a2-386b44cdeb30.docx","bytes":43785,"classification":"Reasons for Intervention"}]},"decisionRequired":false},"classification":"Ministerial","dfp":false}