{"amendmentNumber":"GC160","schemes":[{"name":"Campaspe","code":"camp"},{"name":"Gannawarra","code":"gann"},{"name":"Greater Bendigo","code":"gben"},{"name":"Greater Shepparton","code":"gshe"},{"name":"Loddon","code":"lodd"},{"name":"Moira","code":"moir"},{"name":"Swan Hill","code":"swan"}],"description":"The amendment replaces the Incorporated Document titled Goulburn-Murray Water Connections Project, August 2015 with Goulburn-Murray Water Connections Project, June 2020 to extend the expiry from 30 June 2020 to 31 December 2021; applies Clause 45.12 Specific Controls Overlay to the area affected by the document, in place of Clause 51.01, and makes consequential changes to the Schedules to Clause 72.03 What does this Scheme consist of? and Clause 72.04 Documents incorporated in this Planning Scheme in the Campaspe, Gannawarra, Greater Bendigo, Greater Shepparton, Loddon, Moira and Swan Hill planning schemes.","status":"Finished","statusDate":"2020-06-30T00:00:31Z","planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"Level 16 8 Nicholson Street East Melbourne VIC 3002 Australia","phone":"(03) 8683 0964"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2020-06-23T00:00:00Z"},"gazettal":{"date":"2020-06-30T00:00:00Z","operationalDate":"2020-06-30T00:00:00Z","explanatoryReport":{"filename":"GC160 Explanatory Report Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_d27a104b-29ed-430f-9c92-94e9b46192f7_GC160%20Explanatory%20Report%20Approval%20Gazetted.pdf","bytes":68265},"instructionSheet":{"filename":"GC160 Instruction Sheet Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_24869814-c787-44a6-8c4c-c69a6341953a_GC160%20Instruction%20Sheet%20Approval%20Gazetted.pdf","bytes":16724},"clausesAndSchedules":[{"filename":"GC160 Final Ordinance Approval Gazetted.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_71734598-fba7-4755-9a4f-2b7f9a0c1f9a_GC160%20Final%20Ordinance%20Approval%20Gazetted.zip","bytes":4584987}],"mapSheets":[{"filename":"GC160 Amendment Maps Approval Gazetted.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_ae4153d2-4631-40ea-9ded-3b59df2516f9_GC160%20Amendment%20Maps%20Approval%20Gazetted.zip","bytes":52498743}],"supportingDocuments":[{"filename":"GC160 Planning Scheme Amendment Lists.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_1f35d75c-4f68-4582-871a-5c515bbd9b66_GC160%20Planning%20Scheme%20Amendment%20Lists.zip","bytes":2302453},{"filename":"GC160 Reasons for Intervention Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_d42709bd-8a53-4af7-a9a4-6aacc7d79ab6_GC160%20Reasons%20for%20Intervention%20Approval%20Gazetted.docx","bytes":32260},{"filename":"GC160 Track Changes Approval Gazetted.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_04828982-9f62-4b66-ace2-75380e4a931d_GC160%20Track%20Changes%20Approval%20Gazetted.zip","bytes":2747571}],"incorporatedDocuments":[{"filename":"GC160 Goulburn-Murray Water Connections Project Incorporated Document, June 2020.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/2e7cbee9-4084-ea11-a811-000d3a6a992a_2e998702-43ca-4c7e-a2b6-bc467d46835c_GC160%20Goulburn-Murray%20Water%20Connections%20Project%20Incorporated%20Document,%20June%202020.pdf","bytes":2063275}],"otherDocuments":[]},"decisionRequired":false},"classification":"Ministerial","dfp":false}