{"amendmentNumber":"GC202","schemes":[{"name":"Mildura","code":"mild"},{"name":"Swan Hill","code":"swan"}],"description":"The amendment applies the Specific Controls Overlay to land approximately 30 kilometres upstream of the Euston Weir near Robinvale and approximately 75 kilometres south of Mildura in north-west Victoria to facilitate the use and development of land for the Belsar-Yungera Floodplain Restoration Project and the Hattah Lakes North Floodplain Restoration Project","status":"Finished","statusDate":"2025-04-02T00:01:36Z","environmentalEffectsStatementNeeded":true,"planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"Level 16, 8 Nicholson Street East Melbourne VIC 3002 Australia","phone":"(03) 8683 0964"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2024-11-12T13:00:00Z"},"gazettal":{"date":"2024-12-04T13:00:00Z","operationalDate":"2024-12-04T13:00:00Z","explanatoryReport":{"filename":"GC202 Explanatory Report Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%20Explanatory%20Report%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_fc06ac17-b66e-4d1c-ae3e-9294c0f8faad.docx","bytes":2718472},"instructionSheet":{"filename":"GC202 Instruction Sheet Approval Gazetted.doc","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%20Instruction%20Sheet%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_78be8856-cc03-40de-8395-85e30b3d42b7.doc","bytes":76288},"clausesAndSchedules":[{"filename":"45.12_mild Schedule Specific Controls Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/45.12_mild%20Schedule%20Specific%20Controls%20Overlay_bc73a927-98a9-ec11-9840-00224812c90e_eed81032-0697-47cf-85db-d3bdc87cea6e.pdf","bytes":137605},{"filename":"45.12_swan Schedule Specific Controls Overlay.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/45.12_swan%20Schedule%20Specific%20Controls%20Overlay_bc73a927-98a9-ec11-9840-00224812c90e_42d7662e-c265-4828-ad32-c253efb6c770.pdf","bytes":142524},{"filename":"72.01_mild Schedule Responsible Authority for this Planning Scheme.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.01_mild%20Schedule%20Responsible%20Authority%20for%20this%20Planning%20Scheme_bc73a927-98a9-ec11-9840-00224812c90e_7fb43996-3b08-451a-9a64-0b368b338cd2.pdf","bytes":129654},{"filename":"72.01_swan Schedule Responsible Authority For This Planning Scheme.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.01_swan%20Schedule%20Responsible%20Authority%20For%20This%20Planning%20Scheme_bc73a927-98a9-ec11-9840-00224812c90e_07a33b4f-8ec3-45e0-b3f3-fb020edec789.pdf","bytes":130425},{"filename":"72.03_mild Schedule What does this Planning Scheme consist of.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.03_mild%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of_bc73a927-98a9-ec11-9840-00224812c90e_4db31899-03b7-42e2-899e-82d362306c77.pdf","bytes":89195},{"filename":"72.03_swan Schedule What does this Planning Scheme consist of.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.03_swan%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of_bc73a927-98a9-ec11-9840-00224812c90e_b6758394-9784-4ade-afb5-6f7ac021dbb1.pdf","bytes":88242},{"filename":"72.04_mild Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_mild%20Schedule%20Incorporated%20Documents_bc73a927-98a9-ec11-9840-00224812c90e_af258f13-d994-42b3-8c6d-4a17b62c9ad5.pdf","bytes":157005},{"filename":"72.04_swan Schedule Incorporated Documents.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/72.04_swan%20Schedule%20Incorporated%20Documents_bc73a927-98a9-ec11-9840-00224812c90e_f9a30381-51d1-43f5-8705-43e0aca9dded.pdf","bytes":147050}],"mapSheets":[{"filename":"GC202 Mildura 001scoMaps41_42_46 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%20Mildura%20001scoMaps41_42_46%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_9fd245da-8bbe-4fcb-a319-94386ea87e73.pdf","bytes":710786},{"filename":"GC202 Swan Hill 001scoMaps05_06 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%20Swan%20Hill%20001scoMaps05_06%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_79fd094b-05ae-47b4-b714-3ab4e209c35c.pdf","bytes":2324918}],"supportingDocuments":[{"filename":"GC202 45.12_mild Schedule Specific Controls Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2045.12_mild%20Schedule%20Specific%20Controls%20Overlay%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_9e59f0e1-d522-40ae-b44f-2e121b50143c.pdf","bytes":139576},{"filename":"GC202 45.12_swan Schedule Specific Controls Overlay track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2045.12_swan%20Schedule%20Specific%20Controls%20Overlay%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_ca6da898-4689-45c6-9ace-aab3d750bd99.pdf","bytes":144325},{"filename":"GC202 72.01_mild Schedule Responsible Authority for this Planning Scheme track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.01_mild%20Schedule%20Responsible%20Authority%20for%20this%20Planning%20Scheme%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_92405266-7632-41f1-9854-0da20cc9fa2b.pdf","bytes":130537},{"filename":"GC202 72.01_swan Schedule Responsible Authority For This Planning Scheme track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.01_swan%20Schedule%20Responsible%20Authority%20For%20This%20Planning%20Scheme%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_065c8e27-e026-4480-9a67-8773370a9db0.pdf","bytes":131341},{"filename":"GC202 72.03_mild Schedule What does this Planning Scheme consist of track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.03_mild%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_39b29469-35f6-4e4b-92c3-56b475e8b5aa.pdf","bytes":90111},{"filename":"GC202 72.03_swan Schedule What does this Planning Scheme consist of track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.03_swan%20Schedule%20What%20does%20this%20Planning%20Scheme%20consist%20of%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_bf714cd8-5e4c-4b9d-ab9a-3eb89ed9e909.pdf","bytes":88611},{"filename":"GC202 72.04_mild Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.04_mild%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_82d0d458-0e15-46b4-9cd2-6262ba728c58.pdf","bytes":157467},{"filename":"GC202 72.04_swan Schedule Incorporated Documents track changes Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%2072.04_swan%20Schedule%20Incorporated%20Documents%20track%20changes%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_09d82c45-2f57-4d04-821b-209ccf96544a.pdf","bytes":147754}],"incorporatedDocuments":[{"filename":"Victorian Murray Floodplain Restoration Project, Belsar-Yungera Floodplain Restoration Project and Hattah Lakes North Floodplain Restoration Project (Department of Transport and Planning, May 2024).pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/Victorian%20Murray%20Floodplain%20Restoration%20Project,%20Belsar-Yungera%20Floodplain%20Restoration%20Project%20and%20Hattah%20Lakes%20North%20Floodplain%20Restoration%20Project%20(Department%20of%20Transport%20and%20Planning,%20May%202024)_bc73a927-98a9-ec11-9840-00224812c90e_9ae755b8-f0f8-4c2d-a80b-3dcaa3f8d6e9.pdf","bytes":100613}],"otherDocuments":[{"filename":"GC202 Reasons for Intervention Approval Gazetted.docx","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/GC202%20Reasons%20for%20Intervention%20Approval%20Gazetted_bc73a927-98a9-ec11-9840-00224812c90e_6fbb2da4-06ea-48cb-b467-472477ed92e1.docx","bytes":54601,"classification":"Reasons for Intervention"}]},"decisionRequired":false},"classification":"Ministerial","dfp":false}