{"amendmentNumber":"GC35","schemes":[{"name":"Campaspe","code":"camp"},{"name":"Gannawarra","code":"gann"},{"name":"Greater Bendigo","code":"gben"},{"name":"Greater Shepparton","code":"gshe"},{"name":"Loddon","code":"lodd"},{"name":"Moira","code":"moir"},{"name":"Swan Hill","code":"swan"}],"description":"The amendment insert a revised incorporated document (to replace the existing versions of the incorporated document), which has been amended to facilitate planning approval for the previously excluded On-farm Works (undertaken by GMWCP and their contractors) associated with the GMWCP.","status":"Finished","statusDate":"2015-11-19T11:00:00Z","environmentalEffectsStatementNeeded":false,"planningAuthorityContact":{"authority":"Minister for Planning","fullAddress":"Level 16 8 Nicholson Street East Melbourne VIC 3002 Australia","phone":"(03) 8683 0964"},"unpublished":false,"outcome":"Approved","stages":{"exhibitionRequired":false,"panelRequested":false,"planningAuthority":{"decision":"Adopted","decisionDate":"2015-11-03T05:30:00Z"},"submittedDate":"2015-07-10T10:00:00Z","gazettal":{"date":"2015-11-19T11:00:00Z","operationalDate":"2015-11-19T11:00:00Z","explanatoryReport":{"filename":"GC35 Explanatory Report Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_0f60cd12-25c5-44b0-963f-2cba1b29fa02_GC35%20Explanatory%20Report%20Approval%20Gazetted.pdf","bytes":60702},"instructionSheet":{"filename":"GC35 Instruction Sheet Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_5d4a8ed9-6c08-4919-8741-bfa8a880a11a_GC35%20Instruction%20Sheet%20Approval%20Gazetted.pdf","bytes":9876},"clausesAndSchedules":[{"filename":"GC35 Planning Scheme Amended Provisions.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_e805a710-1274-4b45-b06c-c0098b8bf3c2_GC35%20Planning%20Scheme%20Amended%20Provisions.zip","bytes":157654}],"mapSheets":[],"supportingDocuments":[{"filename":"GC35 Planning Scheme Amended Provisions - Track Changes.zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_d0245b39-fb63-42e8-8bc9-56beb1a3f4a8_GC35%20Planning%20Scheme%20Amended%20Provisions%20-%20Track%20Changes.zip","bytes":164204},{"filename":"GC35 Planning Scheme Amendment Lists (7).zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_843d4449-3ead-443c-b742-79a97bca3dec_GC35%20Planning%20Scheme%20Amendment%20Lists%20(7).zip","bytes":1389522},{"filename":"GC35 RAP Instruction Sheet(7) .zip","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_6720f60b-9893-4f66-b37d-23429e94d761_GC35%20RAP%20Instruction%20Sheet(7)%20.zip","bytes":590180},{"filename":"GC35 Reasons for Intervention Approval Gazetted.doc","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_5fe038b7-af03-4f98-96e2-4119dc6c4e7f_GC35%20Reasons%20for%20Intervention%20Approval%20Gazetted.doc","bytes":90112}],"incorporatedDocuments":[{"filename":"GC35 Incorp Doc- Earthworks Controls in the Campaspe, Greater Shepparton & Moira Aug 15 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_7c8fde70-4b9c-4a59-b7e2-81480de658a3_GC35%20Incorp%20Doc-%20Earthworks%20Controls%20in%20the%20Campaspe,%20Greater%20Shepparton%20&%20Moira%20Aug%2015%20Approval%20Gazetted.pdf","bytes":39123},{"filename":"GC35 Incorp Doc-Goulburn-Murray Connections Project August 2015 Approval Gazetted.pdf","url":"https://stfpbsprodapp01.blob.core.windows.net/amendmentfiles/e745880a-6c70-e811-a860-000d3ad0ed15_cf3ed995-2df7-42ca-bac5-590ed9ae0a05_GC35%20Incorp%20Doc-Goulburn-Murray%20Connections%20Project%20August%202015%20Approval%20Gazetted.pdf","bytes":1953986}],"otherDocuments":[]},"decisionRequired":true},"classification":"Ministerial","dfp":false}