{"ordinanceID":"21740052","title":"SCHEDULE 1 TO CLAUSE 44.05 SPECIAL BUILDING OVERLAY","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule","ordinanceLevel":"LPP","ordinanceMapCode":"SBO1","ordinanceIncludable":"no","orderIndex":1224,"ordinanceNumber":"SCHEDULE 1","semanticNumber":"44.05-s1","content":"<p>Shown on the planning scheme map as <strong>SBO1.</strong> </p><h2><span><span> </span>URBAN DRAINAGE MANAGEMENT AREA</span><br></h2>","ordinanceSections":[{"ordinanceID":"21740053","title":"1.0 Flooding management objectives to be achieved","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule Section","ordinanceLevel":"LPP","ordinanceMapCode":"","ordinanceIncludable":"no","orderIndex":1225,"ordinanceNumber":"1.0","semanticNumber":"44.05-s1-1.0","content":"<p>None specified.</p>"},{"ordinanceID":"21740054","title":"2.0 Statement of risk","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule Section","ordinanceLevel":"LPP","ordinanceMapCode":"","ordinanceIncludable":"no","orderIndex":1226,"ordinanceNumber":"2.0","semanticNumber":"44.05-s1-2.0","content":"<p>None specified.</p>"},{"ordinanceID":"21740055","title":"3.0 Permit requirement","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule Section","ordinanceLevel":"LPP","ordinanceMapCode":"","ordinanceIncludable":"no","orderIndex":1227,"ordinanceNumber":"3.0","semanticNumber":"44.05-s1-3.0","content":"<p>A permit is not required to construct a building or construct or carry out works on land subject to an existing planning permit, restriction or agreement:</p><ul><li><p class=\"\">If land has been developed in accordance with a planning permit, restriction or section 173 agreement requiring its ground level to be finished at least 300 millimetres above the 100-year ARI (average recurrence interval) flood level; and</p></li><li><p class=\"\">Survey plans confirm that the ground level has been constructed in accordance with the requirements of a planning permit, restriction or subdivision; and</p></li><li><p class=\"\">Any buildings and works do not lower the ground level or result in a finished floor level for a dwelling that is below 300 millimetres above the 100-year ARI flood level.</p></li></ul>"},{"ordinanceID":"21740056","title":"4.0 Application requirements","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule Section","ordinanceLevel":"LPP","ordinanceMapCode":"","ordinanceIncludable":"no","orderIndex":1228,"ordinanceNumber":"4.0","semanticNumber":"44.05-s1-4.0","content":"<p>None specified.</p>"},{"ordinanceID":"21740057","title":"5.0 Decision guidelines","amendmentNumber":"C245gben","gazettalDate":"18/12/2020","ordinanceType":"Schedule Section","ordinanceLevel":"LPP","ordinanceMapCode":"","ordinanceIncludable":"no","orderIndex":1229,"ordinanceNumber":"5.0","semanticNumber":"44.05-s1-5.0","content":"<p>None specified.</p>"}],"planningScheme":{"schemeID":"gben","title":"Greater Bendigo","amendmentNumber":"VC319","gazettalDate":"22/10/2026"},"parentOrdinance":{"ordinanceID":"21740044","title":"44.05 SPECIAL BUILDING OVERLAY","amendmentNumber":"VC203","gazettalDate":"01/07/2021","ordinanceType":"Sub-Clause","ordinanceLevel":"VPP","ordinanceMapCode":"SBO","ordinanceIncludable":"yes","orderIndex":1216,"ordinanceNumber":"44.05","semanticNumber":"44.05"}}